Media Kit

Media inquiries

MidAmerica St. Louis Airport works to ensure journalists have accurate and current information about the airport and its operations. The following Media Kit contains detailed information about MidAmerica St. Louis Airport, its tenants, nonstop destinations and current infrastructure projects. For direct media inquiries, please reach out to:

Darren James
Airport Director, MidAmerica St. Louis Airport (BLV)
618.566.5240
[email protected]

Airport Information

Since opening in 1998, MidAmerica St. Louis Airport (BLV) has become the airport of choice for leisure travelers in the St. Louis region. Passenger traffic at BLV surged to 163,210 passengers served in 2022, continuing a trend of positive passenger growth. In addition to significant air carrier activity, the airport sees regular usage for corporate/business, military, air cargo operations, aerospace manufacturing, and aerospace technology research.

Governed by the St. Clair County Public Building Commission, MidAmerica St. Louis Airport has the unique distinction of operating under a joint use agreement with Scott Air Force Base (SAFB), one of just 21 joint-use airports in the country BLV’s convenient location, ample developable land, designation as a Foreign Trade Zone (FTZ #31) and onsite U.S. Customs Facility make the airport an ideal business partner for a wide variety of industries.

MidAmerica St. Louis Airport and SAFB contribute a combined $3.1 billion to the economy annually. The facility accounts for 23,442 jobs between operations at the airport, SAFB and the various tenants onsite.

Following is a list of some of the major airport tenants and the year they began operations at MidAmerica St. Louis Airport:

  • AVMATS – 2002
  • Illinois State Police – 2004
  • Customs and Border Protection – 2007
  • Boeing St. Clair Production Facility – 2010
  • North Bay Produce – 2012
  • North American Helicopter – 2021
  • Boeing’s MQ-25 Manufacturing Facility -opening summer 2024
  • Automated Teller Machine (ATM)
  • An abundance of charging stations/workspaces
  • A variety of food and beverage options, including snacks, pizza, beer and wine, as well as vending machines offering grab-and-go items for your flight
  • Two service animal relief areas
  • New family restrooms and a nursing room
  • Water Refilling Stations
  • Onsite $9/Day Economy Parking
  • TSA Pre✓ Lane in Main Terminal
  • Enterprise Rent-a-Car Services and Ground Transportation Shuttle between Shiloh-Scott AFB Metrolink to BLV

MidAmerica St. Louis Airport is easy to access from anywhere in the St. Louis/Southwestern Illinois region. The airport is located at 9656 Air Terminal Drive, Mascoutah, IL 62258, approximately .25 miles south of Interstate 64 (Exit 23) on Illinois Highway 4, where it enjoys easy access to five interstate highways via I-64.

Passenger service to a dozen different destinations is offered by Allegiant*. From America’s favorite small cities to world-class destinations, Allegiant makes leisure travel affordable and convenient for those in the St. Louis region.

Nonstop Destinations:

  • Charleston – CHS
  • Destin/Ft. Walton Beach – VPS
  • Ft. Lauderdale – FLL
  • Ft. Myers/Punta Gorda – PGD
  • Jacksonville – JAX
  • Knoxville – TYS
  • Las Vegas – LAS
  • Myrtle Beach – MYR
  • Orlando/Sanford – SFB
  • Phoenix/Mesa – AZA
  • Sarasota/Bradenton – SRQ
  • Savannah – SAV
  • Tampa Bay/St. Pete – PIE

*All Flights Subject to Change. Visit flymidamerica.com or allegiantair.com for current schedules and all nonstop destination information.

New Passenger Terminal – A 41,000-square-foot addition to the existing terminal was completed in June 2023, delivering an expanded departure lounge, nursing area, service animal relief area, new boarding bridges, more concession options and additional accommodations for people with disabilities. The $30 million project also includes improvements to the original terminal that should be completed in early 2024.

Taxiway Lima – Work to add nearly 3,100 linear feet of new Taxiway Lima pavement and a new Taxiway Bridge over Crooked Creek was also completed in August 2023. The $37.7 million project will provide airfield access to a future aviation business park on the south side of MidAmerica St. Louis Airport, where the new Boeing Production Facility already under construction will be the first tenant. The project also included drainage improvements, a new perimeter security fence, the extension of the existing perimeter road and improvements to the electrical and access control.

Boeing Manufacturing Facility – Boeing completed its $200 million, 300,000-square-foot manufacturing facility at MidAmerica St. Louis Airport in March 2024, marking a major milestone in the airport’s growing aviation business park. The facility initially supports approximately 150 employees, with capacity to expand to as many as 300 as production demand increases. The site is dedicated to manufacturing the MQ-25 Stingray — the U.S. Navy’s first operational, carrier based unmanned aerial refueling aircraft — which successfully completed its first taxiway test in January 2026.

MetroLink Expansion – The new MetroLink extension to MidAmerica St. Louis Airport — which was estimated to be a $97 million investment — is entering its final phase. With construction completed, system testing is now underway and revenue service is expected to begin in summer 2026. The 5.2-mile expansion extends MetroLink service from the Shiloh-Scott Transit Center to a new station directly adjacent to the airport terminal, offering seamless rail access for passengers, employees and tenants while linking MidAmerica St. Louis Airport and St. Louis Lambert International Airport through a single light rail system.

General Aviation Facility/Federal Inspection Station – The new 25,277-square-foot Federal Inspection Station represents the latest strategic infrastructure investment at MidAmerica St. Louis Airport, supporting continued passenger growth and operational efficiency. The facility includes an embedded General Aviation Facility that is slated to open in spring 2026 and be capable of accommodating international flights of up to 20 passengers. The Federal Inspection Station remains on track for completion in summer 2027, positioning the airport to expand future international service opportunities.

For the latest news on projects and other developments at MidAmerica St. Louis Airport, visit the media center.

To access airport images and logos, please use the dropbox link below:

Airport Leadership

Darren James

Airport Director

Jennifer Hogancamp

Assistant Airport Director

In the News

View the latest press releases and news stories for MidAmerica St. Louis Airport.

Media Guide

Refer to the media guide for media inquiries and for information about protocols that need to be followed while at MidAmerica St. Louis Airport.

DARREN JAMES

Airport Director

Darren has served as Director of MidAmerica St. Louis Airport (BLV) since August 2023. In this capacity, he is responsible for management, development, planning and community relations for the airport, which operates under a Joint Use Agreement with Scott Air Force Base. Darren directs projects related to air service expansion, business and land use development, strategic business planning and tenant relations.

Darren has more than three decades of leadership experience in global aviation operations and National Security. A retired 1-star General, he completed a distinguished, 30-year career in the United States Air Force in 2020, where he served in numerous high-level positions. His background also includes forming a consulting LLC and advising on numerous issues, including leadership development, change management, strategy development and execution, and strategic communication.

Darren received his commission from the U.S. Air Force Academy, graduating with a Bachelor of Science in Human Factors Engineering. He also holds three master’s degrees: a Master of Military Operational Art and Science from Air University, a Master of Science in Aeronautical Science from Embry-Riddle University and a Master of Science in National Resource Strategy and Policy from the Eisenhower School for National Security and Resource Strategy. He is a Certified Member of the American Association of Airport Executives.

Media Contact
Darren James
Airport Director, MidAmerica St. Louis Airport (BLV)
618.566.5240
[email protected]

JENNIFER HOGANCAMP

Assistant Airport Director

Jennifer Hogancamp has served as Assistant Airport Director of MidAmerica St. Louis Airport since Nov. 2023. In this role, she works closely with Airport Director Darren James to plan, organize, and direct the day-to-day activities of all maintenance, operations, and public safety functions of MidAmerica St. Louis Airport.

Jennifer has more than two decades of airport management leadership experience. Before joining MidAmerica St. Louis Airport, she served as Director of Airports for Mobile Airport Authority, where she was responsible for directing and overseeing the operations and development of three airports in Alabama, in addition to overseeing maintenance operations at an airport industrial complex. Her background also includes managing the daily terminal operations and serving over 36 million passengers annually during her time as Airport Operations Manager at Fort Lauderdale-Hollywood International Airport (FLL), as well as serving in leadership roles at three different airports across Texas over a span of 14 years.

Jennifer holds a Bachelor of Science in Aviation Management from Southern Illinois University. She is also a certified member of the American Association of Airport Executives.